- Location: Sandwich Kent
- Client: Caunton Engineering
- Main: BWSC
- Tonnage: 900 tonnes
Scope of Work: Erection of boiler structure in 3 phases including using 4 large cranes to erect the roof in modules with all access being from man baskets.
Turbine Hall, Wood chip storage building, electrical building and pipe racks.