Kent Renewable Energy

  • Location:  Sandwich Kent
  • Client:  Caunton Engineering
  • Main:  BWSC
  • Tonnage:  900 tonnes
Scope of Work: Erection of boiler structure in 3 phases including using 4 large cranes to erect the roof in modules with all access being from man baskets. Turbine Hall, Wood chip storage building, electrical building and pipe racks.