- Location: Deeside
- Client: TCS Belgium
- Main: CNIM
- Tonnage: 1100 tonnes
Scope of Work: Boiler structure for waste to energy plany, included modulating steel work on floor to minimise work at 50m level. Heavy boiler beams, open steel flooring, handrailing and stairs.Challenging job working with and around boiler and other plant.