Bucks EFW

  • Location:  Aylesbury
  • Client:  Caunton Engineering
  • Main:  McAlpines/Hitachi
  • Tonnage:  2100 tonnes
Scope of Work: Erection of envelope steel work over previously installed Boiler,Waste building,Flue Gas Structure and tipping hall. This involved erection of Boiler Hall Roof trusses at 50m level with all erection being carried out from Man Baskets. ACC structrure roof was assembled on the floor and cladded prior to lifting.